$M
Description:
To support Atlas Iron’s growing operations, the Utah Point Stockyard #2 was upgraded to support a 12Mtpa throughput increase. The project involved the design & construct of a new stockyard conveying system and partial demolition and modification of the existing system and 2x radial stackers.
Aspect Scope:
Aspect was engaged to provide local industry knowledge and project support to the DHHI execution team, including design, engineering, construction & commissioning assistance. Aspect was involved from the tender stage through to commissioning and operational handover.
Client:
Location:
Period:
DHHI & Atlas Iron
Utah Point, Port Hedland (WA)
Jun 2022-Nov 2023