DHHI & Atlas Iron
Utah Point, Port Hedland (WA)
June 2022 – November 2023
Approx. $50 Million

Description

To support Atlas Iron’s growing operations, the Utah Point Stockyard #2 was upgraded to support a 12Mtpa throughput increase. The project involved the design & construct of a new stockyard conveying system and partial demolition and modification of the existing system and 2x radial stackers.

Aspect Scope

Aspect was engaged to provide local industry knowledge and project support to the DHHI execution team, including design, engineering, construction & commissioning assistance. Aspect was involved from the tender stage through to commissioning and operational handover.