Our Projects

Client
Location
Contract Period
Project Value

Fortescue Metal Group (FMG)
Thomas Yard, Port Hedland WA
September 2021 – July 2023
Approx. $3.5 Million

Description

The engineering, supply and replacement of the Underfloor Wheel Lathe at FMG’s Thomas Yard (Rolling Stock Maintenance Facility). The existing lathe was removed and replaced with an upgraded 45t axle capacity lathe to future proof the FMG RSM network.

Aspect Scope

Partnering with Andrew Engineering, we delivered the full scope of design, supply, installation, and commissioning of the new Hegenscheidt U2000-450 Wheel Lathe. The existing lathe was removed and stored for future refurbishment.