Description:
Rio Tinto’s Robe Valley Sustaining (RVS) Project, included two major developments to its existing Mesa J hub. The scope of work included construction of a new Wet Plant Thickener Facility, Rescreening Facility, and Flocculant System at Processing Plant 2 (PP2), and upgrades to the Primary Sizer, including a new Secondary Sizer, and existing Train Load Out (TLO).
Aspect Scope:
Aspect was engaged by UGL to provide engineering and quantity surveying services for the life of the project. Our engineering team covered SMP, E&I & Civil. Separate Aspect teams were engaged to plan and manage the commissioning and final plant tie in shutdown.
Client:
Location:
Period:
Rio Tinto & UGL Limited
Robe Valley, Mesa J
Nov 2021 – August 2023